Print Back
Reconditioning the used Watertube Boiler(s) includes but not limited to the following: boilers re-tubed as required, cleaned on the fireside, waterside, outside, and painting, new fireside and waterside gaskets are installed, hydrostatic tests are done on the vessel. Additionally tubes, boiler trim piping, and blow down piping and valves and new Honeywell or Fireye controls are installed along with new electrical and control panels are installed as needed. New steam pressure controls are installed, the boilers are re-wired as needed, new safety relief valves are installed or shipped loose for field installation, electrical and mechanical checks are performed to identify defective components, defective components found are replaced. We guarantee that the pressure vessel and tubes are in good condition and that the boiler will pass a hydrostatic test at the time of startup. A one (1) year parts replacement warranty on controls is included.

Used, reconditioned Watertube Boilers, Watertube 3 & 4 pass dry back boilers, Watertube 3 & 4 pass wet back boilers, high pressure boilers, low pressure boilers, hot water boilers, Watertube boiler feed water systems, atmospheric tanks, pressurized deaerators, blow down tanks, blow down separators, flash steam economizers, stack economizers, boiler flame safeguard controls, boiler combustion controls, boiler water level controls.
watertube-boilers
Unit of Measure
1 

Item #

Year

PPH Steam/Hr

Manufacturer

Pressure

Steam or Hot Water

Burner

Fuel(s)

9530000 N/A 1995 N/A 30000 N/A Nebraska Boiler D-Type N/A 250 psi N/A Steam N/A Coen N/A natural gas/oil
9450000 N/A 1994 N/A 50000 N/A Babcock-Wilcox D-Type N/A 250 psi N/A Steam N/A John Zink N/A natural gas
1475000-1 N/A 2014 N/A 75000 N/A Babcock-Wilcox D-Type N/A 250 psi N/A Steam N/A Faber 30 PPM NOx N/A natural gas
1475000-2 N/A 2014 N/A 75000 N/A Babcock-Wilcox D-Type N/A 250 psi N/A Steam N/A Faber 30 PPM NOx N/A natural gas
Unit of Measure
1