Print Back
Reconditioning the used Cleaver Brooks Boiler(s) includes but not limited to the following: boilers re-tubed as required, cleaned on the fireside, waterside, outside, and painting, new fireside and waterside gaskets are installed, hydrostatic tests are done on the vessel. Additionally tubes, boiler trim piping, and blow down piping and valves and new Honeywell or Fireye controls are installed along with new electrical and control panels are installed as needed. New steam pressure controls are installed, the boilers are re-wired as needed, new safety relief valves are installed or shipped loose for field installation, electrical and mechanical checks are performed to identify defective components, defective components found are replaced. We guarantee that the pressure vessel and tubes are in good condition and that the boiler will pass a hydrostatic test at the time of startup. A one (1) year parts replacement warranty on controls is included.

Used, reconditioned Cleaver Brooks Boilers, Cleaver Brooks 3 & 4 pass dry back boilers, Cleaver Brooks 3 & 4 pass wet back boilers, Cleaver Brooks water tube boilers, high pressure boilers, low pressure boilers, hot water boilers, Cleaver Brooks boiler feed water systems, atmospheric tanks, pressurized deaerators, blow down tanks, blow down separators, flash steam economizers, stack economizers, boiler flame safeguard controls, boiler combustion controls, boiler water level controls.
Cleaver brooks 400HP
Unit of Measure
Items Cleaver brooks 400HP
0360
60 HP Cleaver Brooks Boiler
Cleaver brooks 400HP
03100-2
100 HP Cleaver Brooks Boiler
Cleaver brooks 400HP
03100-1
100 HP Cleaver Brooks Boiler
Cleaver brooks 400HP
93125
125 HP Cleaver Brooks Boiler
Cleaver brooks 400HP
95150
150 HP/PPH Cleaver Brooks Boiler
Description N/A Reconditioning the used Cleaver Brooks Boiler(s) includes but not limited to the following: boilers re-tubed as required, cleaned on the fireside, waterside, outside, and painting, new fireside and waterside gaskets are installed, hydrostatic tests are done on the vessel. Additionally tubes, boiler trim piping, and blow down piping and valves and new Honeywell or Fireye controls are installed along with new electrical and control panels are installed as needed. New steam pressure controls are installed, the boilers are re-wired as needed, new safety relief valves are installed or shipped loose for field installation, electrical and mechanical checks are performed to identify defective components, defective components found are replaced. We guarantee that the pressure vessel and tubes are in good condition and that the boiler will pass a hydrostatic test at the time of startup. A one (1) year parts replacement warranty on controls is included.

Used, reconditioned Cleaver Brooks Boilers, Cleaver Brooks 3 & 4 pass dry back boilers, Cleaver Brooks 3 & 4 pass wet back boilers, Cleaver Brooks water tube boilers, high pressure boilers, low pressure boilers, hot water boilers, Cleaver Brooks boiler feed water systems, atmospheric tanks, pressurized deaerators, blow down tanks, blow down separators, flash steam economizers, stack economizers, boiler flame safeguard controls, boiler combustion controls, boiler water level controls.
Number N/A N/A N/A N/A N/A 1
Year N/A 2003 N/A 2003 N/A 2003 N/A 1993 N/A 1995
Horsepower N/A 60 hp N/A 100 hp N/A 100 hp N/A 125 hp N/A 150 hp
Manufacturer N/A Cleaver Brooks N/A Cleaver Brooks N/A Cleaver Brooks N/A Cleaver Brooks N/A Cleaver Brooks CBLE
Description N/A N/A N/A N/A N/A 4 pass dry-back
Pressure N/A 150 psi N/A 150 psi N/A 150 psi N/A 200 psi N/A 150 psi
Steam or Hot Water N/A Steam
Burner N/A ProFire N/A Cleaver Brooks N/A Cleaver Brooks N/A Cleaver Brooks N/A Cleaver Brooks 30 PPM NOx
Fuel(s) N/A natural gas N/A natural gas N/A natural gas/oil N/A natural gas N/A natural gas/oil