Print Back
Reconditioning the used additional Boiler(s) includes but not limited to the following: boilers re-tubed as required, cleaned on the fireside, waterside, outside, and painting, new fireside and waterside gaskets are installed, hydrostatic tests are done on the vessel. Additionally tubes, boiler trim piping, and blow down piping and valves and new Honeywell or Fireye controls are installed along with new electrical and control panels are installed as needed. New steam pressure controls are installed, the boilers are re-wired as needed, new safety relief valves are installed or shipped loose for field installation, electrical and mechanical checks are performed to identify defective components, defective components found are replaced. We guarantee that the pressure vessel and tubes are in good condition and that the boiler will pass a hydrostatic test at the time of startup. A one (1) year parts replacement warranty on controls is included.

Used, reconditioned Boilers, 3 & 4 pass dry back boilers, 3 & 4 pass wet back boilers, high pressure boilers, low pressure boilers, hot water boilers, boiler feed water systems, atmospheric tanks, pressurized deaerators, blow down tanks, blow down separators, flash steam economizers, stack economizers, boiler flame safeguard controls, boiler combustion controls, boiler water level controls.
Other Boilers
Unit of Measure
Items Other Boilers
9170
70 HP York Shipley Boiler
Other Boilers
94200YS
200 HP York Shipley Boiler
Other Boilers
21200
200 HP Power Master (NEW) Boiler
Number N/A
Year N/A 1991 N/A 1994 N/A 2021
Horsepower N/A 70 hp N/A 200 hp N/A 200 hp
Manufacturer N/A York Shipley N/A York Shipley N/A Power Master (NEW)
Description N/A
Pressure N/A 150 psi N/A 150 psi N/A 250 psi
Steam or Hot Water N/A Steam
Burner N/A York-Shipley N/A York-Shipley N/A Oilon
Fuel(s) N/A natural gas/oil